1 weekStart with a one-week proof on one processStart with a one-week proofWatch the latest Stanford AI & Investment session

Book a call (opens in a new tab)

Power and utilitiesWhat we do, and an illustrative case

Power and utility operations can be improved massively, with solutions already live at peer utilities.

We map how the work really runs from your own systems, measure the gap to best practice, and check every case as it happens.

What a utility can gainPublished results, with their sources

The gains are documented.

  • 2.2M

    customer outages avoided: self-healing grid at Duke Energy, 2025

    Duke Energy, 2025 self-healing grid results, reported 2026

  • 63%

    smaller interconnection queue: PJM in 19 months, with automation and staff

    PJM, “Interconnection queue progress,” ESIG presentation, 2025

  • 30–50%

    lower customer-service cost: AI across utility customer operations

    McKinsey, “How utilities can rewire customer operations with agentic AI,” 2026

  • 15–20%

    lower arrears, with fewer customer complaints

    McKinsey, “How utilities can rewire customer operations with agentic AI,” 2026

What a regulated utility needsLow risk, proven, standards-ready

Built for how you really run.

  • A reliable grid

    Fewer, shorter outages, tracked live on SAIDI and SAIFI.

  • Fair prices

    Lower cost to serve and accurate bills for every rate class.

  • Ready for new demand

    Interconnection and large-load requests mapped end to end.

  • Proven, not experimental

    Only playbooks already live at peers. NERC CIP-ready, on-prem.

Illustrative caseElectric utility: reliability, fair bills, new load

$26.8M saved for customers a year.

Results live at peer utilities. An illustrative case, not an AIx2 client result: ORNL, “Chattanooga EPB case study: distribution automation,” 2016

  • ~2 years → 10 days

    interconnection study

    FERC Commissioner Rosner, interconnection automation letters to RTOs (MISO), 2025

  • −55%

    customers interrupted per outage

    U.S. DOE, “FLISR technologies reduce outage impact and duration,” 2014

  • 1.01% → 0.08%

    estimated bills

    California PUC Decision D.10-12-031 (PG&E smart vs. legacy meter bills), 2010

How we get thereThe Five Step Method

From your own data to live checks on every case.

  1. Step 01: Collecting Data

    Connect billing (SAP IS-U or Oracle CC&B), ADMS and GIS; add AMI/MDM, SCADA and Maximo work orders; capture spreadsheets, e-mail and field notes

  2. Step 02: Mapping Processes and Data Flow

    Map outage-to-restoration as it really runs; map meter-to-cash and bill exceptions; trace interconnection and large-load requests

  3. Step 03: Gap Analysis

    Benchmark SAIDI, SAIFI and cost to serve against peers; flag repeat outages, bill errors and study backlogs

  4. Step 04: Optimal Design

    Start from playbooks already live at peer utilities; build a rate-case-ready transformation plan

  5. Step 05: Implementation Live Assurance

    Run live QC on every work order and bill; flag reliability and billing risk early; report on NERC and PUC metrics in real time